![]() |
||||||||||
The valley module with considerable progress. The lowest level of HOm track is already painted, ballasted, and with catenary. The ETE module electrically system is also being installed with a Märklin decoder. Note the German catenary masts first installed on the main line. |
||||||||||
Previous |
Return |
Next |
||||||||